Site Preparation for a Concrete Slab

This section will deal with the processes required up to and including the pouring of a concrete slab which will include:

  • Excavation of the building site
  • Retaining wall requirements due to the excavation
  • Positioning of string lines to define the building envelope
  • Quotes for concreting and why there will be extra costs
  • Termite barriers within a concrete slab